Short News submitted before 177 days, 4 hours i 33 minutes from www.sciencedaily.com
| |
The trench was about 20 by 30 centimeters (8 by 12 inches) after work by the arm on Saturday. The team sent commands today to extend the longer dimension by about 15 centimeters (6 inches). "Right now, there is not enough real estate of dark icy soil in the trench to do a sample acquisition test and later a full-up acquisition" for the Thermal and Evolved-Gas Analyzer, said Ray Arvidson...
|
|
|
Short News submitted before 198 days, 14 hours i 32 minutes from www.usatoday.com
| |
CAPE CANAVERAL NASA told a Senate panel on Monday that it anticipates losing 3,000 to 4,000 jobs at its launching site once the space shuttles stop flying in two more years, about half the cutback initially reported. Although as many as 6,000 to 7,000 shuttle jobs will be eliminated at Kennedy Space Center, about 3,000 positions will open up in the new exploration program...
|
|
|